doi: 10.7763/IJESD.2012.V3.180
Optimization and Technical Transformation for Desalting Treatment Process of Detergent Factory
- the Liaoning Shihua University, Liaoning, China.
Abstract
Existing process for a detergent factory of de-mineralized water system was as the main research object. According to its water quality characteristics and the investigation for original desalting process, desalting process design was made. Then test experiment was proceeded at 1.2m3/h scale, and the system was divided into three subsystems: Pretreatment, Reverse osmosis desalting system and Electrodeionization treatment system. And stability of new craft was investigated at pilot scale, Results showed that in this craft, SID of ultra filtration effluent was less than 2, desalting ground water completely served as boiler water, and Electrodeionization meet the requirement for processes pure water after secondary treatment. But Electrodeionization effluent quality deteriorated occasionally, so Sodium hydroxide was added by metering
Keywords
- Desalting process
- test experiment
- pilot scale
- electrodeionization
How to Cite
Shuangchun Yang, Yi Pan, Guian Zhang, and Guobin Liu, "Optimization and Technical Transformation for Desalting Treatment Process of Detergent Factory," International Journal of Environmental Science and Development, vol. 3, no. 1, pp. 15-19, 2012. https://doi.org/10.7763/IJESD.2012.V3.180
Copyright & License
Copyright © 2012 by the authors. This is an open access article distributed under the Creative Commons Attribution License which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited (CC BY 4.0).
